Budget: $9.7 million
Start date: Winter 2020
Scheduled completion: Fall 2022

WALT WHITMAN BRIDGE MAIN CABLE INVESTIGATION AND DEHUMIDIFICATION

Project Description

This project is performing detailed inspections of the main suspension cables. In addition, investigating the feasibility of installing a dehumidification system on the bridge to preserve the condition of the main cables and extend the overall life of the bridge.