Press Releases
News - Archive
Released: 10/26/2017
Ben Franklin Bridge Pedestrian Walkway Switch on 10/28 - North Open; South Closed
On Saturday, Oct. 28 the north pedestrian walkway will be open 6 a.m. to 8 p.m. and the south walkway will be closed. The one-day walkway switch to the north walkway is to allow construction work on the south side of the bridge. The south is expected to reopen Sunday, Oct. 29.
Weather permitting, one of the bridge's walkways is open 6 a.m. to 8 p.m. daily. For additional walkway information, please click here.
[ Return to List ]