Press Releases
News - Archive
Released: 2/24/2011
Walt Whitman Bridge Advisory: Intermittent Bridge Closings Week Of 2/28/2011
In preparation for the upcoming redecking of the Walt Whitman Bridge, four existing gantries need to be removed. As a result there will be intermittent closures of the Bridge beginning Monday, 2/28, at 8:00 p.m.
Here is the planned construction schedule:
MONDAY, 2/28, BETWEEN 8PM AND 5AM the Eastbound Lanes of the Walt Whitman Bridge will be closed intermittently for periods up to 20 minutes.
TUESDAY, 3/1, BETWEEN 8PM AND 5AM the Westbound Lanes of the Walt Whitman Bridge will be closed intermittently for periods up to 20 minutes.
WEDNESDAY, 3/2 BETWEEN MIDNIGHT AND 5AM the entire bridge will be closed intermittently for periods up to 20 minutes. Between 8pm and 5am when the Bridge is open traffic will be restricted.
Drivers who would normally use the Walt Whitman Bridge during the construction are advised to use either the Ben Franklin or Commodore Barry Bridge.
[ Return to List ]